nedelja, 3. november 2013

ME AND MY GIRFRIEND FINISHED OUR STUDIO IN OLD FACTORY ROG !

ME AND TATI FINISHED  OUR WORKING STUDIO AFTRE ONE MOUNTH OF WORK .... AND RESOULTS ARE REALLY GOOD .  WE MADE   WOODEN WALLS WITH ISOLACION
AND ANOTHER   LAYER OF WOOD OVER THE  ISOLACION .  THEN WE FIXED THE WINDOWS COUSE  WINDOWS WERE  BROKEN ....WE HAD FUN  WITH TATI WORKING ON  THIS PROJECT ..... NOW WE JUST HAVE TO BRING OVEN AND WOOD AND WE ARE FINISH TOTALLY .... THANKS EVERYBODY WHO HELP BRINGING THE WOOD AND OTHER STUFF  IN THIRD FLOOD COUSE IT WAS REALLY LOT OF WORK ...THANKS A LOT EVERYBODY  . WE LOVE YOU ....
HERE ARE THE PHOTOS AND UNDER PHOTOS SOME TEXT .
INSIDE THE STUDIO  THE FIRST WOODEN WALL WAS GROWING UP 

THEN THE SECOND WALL 

ALSO FATHER CAME TO WISIT US !


SECOND WALL FINISHED  THE WIEW FROM OUTSIDE 

REPARING OF THE  BROKEN WINDOWS 

 
SECOND WALL FROM INSIDE 



 THOSE TREE PHOTOS ARE  PHOTOS FROM ISOLACION  



THEN WE  CLOSED  ISOLACION  WITH ANOTHER LAYER OF WOOD 
AND WE PUT ALSO PROPEN IN THE HOLES 


THEN WE MADE BIG BOX FOR PAINTINGS   WITH PROTECTION FOR WINTER  TIME 

BOX ALMOST FINISHED 

AND THATH WAS IT THE STUDIO IS FINISH  WITH BAD ALSO HEHEH 

ATHER WALL ! 
 HERE ARE SOME MORE BETTER PHOTOS FROM MY DEAR TATI <3 nbsp="" p="">
 CHECK THEM OUT ...
AND ONCE AGAIN THANS TO MY  DEAR TATI FOR ALLL HELP 
WITOUTH HER WOUD BE MUCH MORE DIFFICULT  TO WORK 

ME WORKING IN STUDIO 

TATI WORKING IN STUDIO 

OUR NEW HOME HEHEHE

DETAILS 

DETAILS 

REPAIRING WINDOWS 

BED 
HEHEE
  WE WERE WORKING IN STUDIO NOW FOR  4 OR 5 DAYS ALREADY AND IT,S REALLY NICE VIBE WORKING IN  SOMETING WE BUILD TOHETHER 
HERE ARE SOME MORE BOARD I DI IN NEW STUDIO AND TWO 
 A3 FRAMED DRAWINGS FROM NEW STUDIO 


MY FIRST PRODUCTS FROM ROG STUDIO !
4 MORE HAND PAINTED BOARDS 

DRAWING  FRAMED IN A3 FRAME 
AND ANOTHER FRAMED DRAWING IN A3  FORMAT 


SO THATS IT  IF YOU WHANT  TO CHECK OUR STUDIO JUST CALL ME OR  JUST COME I AM THERE EVERYDAY .

DESMAN FROM THRASHER 
2013 



1 komentar: